On October 12, Culverts were deployed near the Fireboat in FH-2. On October 14, Culverts were deployed in FH-1 near Barge B. On October 30, Culverts were deployed inside Ship Island on FH-9

On October 12, a Barge Load of Culverts was deployed in FH-2 near the Fireboat Reef. The surrounding depth was 56 feet. The Tide was 0.2 feet. Winds were from the SE at 14 knots.

On October 14, a Barge Load of Culverts was deployed in FH-1 near Barge B. The surrounding depth was 64 feet, the tide was 1.5 feet, winds were from the East at 12 knots. 

On October 30, a Barge Load of Culverts was deployed over 2 separate Targets in FH-9. Winds were ESE at 18 knots, the tide was 1.0 feet, the surrounding depth was 18 feet with a minimum depth of 16 feet recorded.

In all these Deployments, Coordinates were taken on the Anchored Barge which was laying mostly in an East-West orientation, so most of the material will be found looking to the North and South of the given coordinates.